← Back to list
Job

Planning Engineers – Transmission Line & Substation - Kutch

Backend Developer • On-site • Full-time • 📍 Kutch
Planning Engineers – Transmission Line & Substation Location: Kutch, Gujarat Contract: 1 Year Project Type: Transmission Line (765 kV) & Substation (400 kV) Available Positions: Planning & Reporting Engineer – Transmission Line (PMC) Planning Engineer – Substation (PMC) Project Details (Detailed Overview): Transmission Line Project – 250 km, 765 kV (3 EPC Packages) 765kV Double Circuit (D/C) Transmission Line extending 250 km. Alignment from Kutch 765 / 400 kV Z2-MPSS to 765 / 400 kV Load Pooling Substation (LPSS). Involves coordination with 3 EPC agencies executing separate TL sections. Planning scope includes: Preparing detailed project schedules (L1/L2/L3) Monitoring EPC progress, foundation casting, erection, stringing sequences Tracking ROW clearances, foundation readiness & material movement Weekly/monthly MIS reporting to client & management Ensuring compliance with overall 765 kV TL project timelines Role requires strong coordination across construction, engineering & EPC teams. Substation Project – SPS#1 (3 × 400kV Sub-Pooling Stations) Development of three 400 kV Sub-Pooling Substations (Z2-SPSS). Each substation has 1.2 GW RTC generation pooling capacity. Located across the Kutch renewable energy zone. Planning responsibilities include: Preparing construction schedules for civil, structural & electrical works Interface planning for GIS/AIS, transformer installation, and cable systems Monitoring progress of control building, gantries, foundations & equipment erection Resource planning, material shortfall alerts & risk assessment Reporting progress to PMC leadership & coordinating with EPC contractors Requires strong understanding of 400 kV substation execution workflows.

Similar jobs